Modern excavation is most useful when its information travels with the work. A drawing or model establishes the intended result, field operations create it, and checks confirm what the next trade receives.

Design information must be current

Identify the controlling plans, references and revisions. Digital guidance can help an operator follow a surface, but it cannot correct a wrong design or reveal every buried service.

The workflow includes material and access

Digging, loading, hauling, import, placement and temporary access need to work together. Technology at the bucket does not remove the need to plan trucks, disposal or required protection.

Close the loop with acceptance

State who checks elevations, observes required formation conditions and provides any testing or as-built information. Those tasks may involve separate professionals and costs.

Common questions

Can 3D modeling prevent every costly mistake?

No. It can help identify certain design or coordination issues, but it depends on correct inputs and does not guarantee actual underground conditions.

What should a technology-equipped bid specify?

The actual benefit for this job, the deliverables and the responsibilities that remain with other parties.

Sources and further reading

Related project information

Discuss your project

Share the current design information and the acceptance records required by the next stage.

Request a free bid through Utah Excavation Company. 801-515-4932.