The excavation process is a sequence of decisions as well as machine work. A clear bid should describe the starting information, the work itself and what happens before the next stage covers the result.
1. Establish the scope
Use the current plans, site location, layout and access information. Identify protected features, utility responsibilities, applicable approvals and the intended completion point.
2. Prepare the work area
Plan equipment and truck movements, material staging and site controls. Clearing and temporary access may be separate items. The actual excavator needs the applicable notification and locating process.
3. Excavate and address conditions
Follow the agreed references and evaluate exposed conditions. If rock, soil, water or a service differs from the assumptions, use the documented decision and change process before continuing affected work.
4. Inspect and complete the next stage
Confirm who accepts the formation, installation or fill, and who arranges inspections or testing. Backfill and restoration may require another visit after another contractor finishes. Include the final surface condition and responsibilities in writing.
Common questions
How long does the sequence take?
That depends on scope, access, conditions, approvals, inspections and coordination. Do not treat an unsupported standard duration as a commitment.
Does requesting a bid schedule the work?
No. The scope, availability, any visit and final schedule still need confirmation.
Sources and further reading
- Blue Stakes of Utah 811: excavator guidance
- Utah Geological Survey: problem soil and rock
- Earthtec Engineering: observations and testing, a professional-service example
Related project information
Discuss your project
Send the current plans and tell us which stage you need help with, including the next trade’s requirements.
Request a free bid through Utah Excavation Company. 801-515-4932.