A useful environmental plan is more specific than calling a project green. It explains what ground will be disturbed, what material can stay, where excess material will go and how soil and water will be controlled during the work.

Reduce unnecessary disturbance

Mark the construction limits and features to protect before equipment arrives. A stockpile area, access route and delivery space can disturb ground outside the final building footprint. Include those temporary areas when discussing erosion control and restoration.

Treat reuse as a materials decision

Separating topsoil, reusable aggregate and mixed debris can create options that a mixed pile does not. But a material is not suitable for structural fill simply because it is already on the property. Project specifications and professional evaluation determine appropriate reuse.

EPA describes reuse and recycling as part of managing construction materials. Local receiving facilities still have their own acceptance conditions, and suspected contamination needs a different response from ordinary clean spoil.

Assign water and dust responsibilities

Ask who maintains erosion controls, keeps material off the road and checks any required stormwater or dust plan. Utah construction stormwater coverage can apply to smaller disturbances within a qualifying common development, not just a single large parcel.

Common questions

Does an electric or newer machine make the whole job sustainable?

Equipment is one consideration. The amount of disturbance, unnecessary hauling, unsuitable material and the restoration plan also matter.

Can all excavated soil be reused?

No. Suitability depends on its condition, intended use, project requirements and any contamination concerns.

Sources and further reading

Related project information

Discuss your project

Include protected features, reuse goals and any environmental reports with the site information in your bid request.

Request a free bid through Utah Excavation Company. 801-515-4932.